Lindberg Field Pavement Failure


               

Group Delta Consultants performed a detailed evaluation of the existing airfield pavements and provided recommendations for areas of failed pavements. 

Project Highlights :

  • Analysis for repair or replacement of failed panels along Taxiway B.  The pavement consisted of 15 in. of PCC overlying 7 in. of cement-treated base underlain by hydraulic fill soils. 
  • Two alternatives of repair or replacement were recommended including partial depth small repairs of the existing PCC pavement, or construction of new PCC pavement.
  • Cement stabilization of subgrade