Anaheim's Platinum triangle is envisioned to be a high density, mixed-use, urban environment that could include up to 9,500 dwelling units, 5 million square feet of office space and over 2 million square feet of commercial uses. Lennar's A-Town Metro project is a cornerstone of this development.
Group Delta Consultants (GDC) is the lead geotechnical engineering firm for all phases of this project from preliminary investigation, design, and construction. GDC reviewed existing data, conducted a field and laboratory investigation, assesed the site and subsurface conditions, and provided our recommendations on potential seismic hazards and seismic design parameters, foundations, earthwork and grading, temporary excavation and shoring, retaining walls, and utility trenches.
Project Highlights :
- Critical sequencing of shoring/excavation due to high density structures
- Cost effective foundation recommendations
- Use of on-site demolition material for CMB