State Route 125


The State Route 125 South Expressway project extends from just north of the Mexican border to State Route 54.  The total project length is approximately 11 miles. 

Project Highlights :

  • Group Delta Consultants (GDC) performed preliminary geotechnical investigations for the Gap, Connector, Main Toll Road, and the Otay River Bridge for CTV as the sole geotechnical engineer.
  • During the preliminary investigation, GDC identified areas which would require blasting or heavy ripping
  • Recommended supporting of most bridges on shallow spread footings
  • We provided site reconnaissance, geologic mapping, drilling and sampling of borings, test pit excavation, geotechnical analysis, and report preparation.