Alameda Corridor East


The Alameda Corridor East (ACE) project includes two railroad alignments extending form Los Angeles to Pomona through the San Gabriel Valley. Improvement along the 2 corridors include 25 grade separation and bridge projects in the Cities of Pomona (3), Los Angeles (1), Industry (12), San Gabriel (4), El Monte (2), Montebello (1), and the County of Los Angeles (2).

Project Highlights :

  • Group Delta Consultants provided geotechnical engineering services pertaining to the environmental impact report (EIR).
  • We evaluated geotechnical conditions, groundwater, earthquakes and seismicity, and flood hazards, at each of the 25 sites.

Construction Cost : 1 Billion