The Eastside LRT is a southeasterly extension of the Pasadena Blue Line and is 5.8 miles long.
Project Highlights :
- Group Delta Consultants performed geotechnical and environmental investigations for the at-grade alignment, stations, bridges, and substations.
- We performed seismic assessments of four existing bridges and provided recommendations for a new bridge over US Highway 101 which were reviewed and approved by Caltrans.
- Moderate seismic accelerations and shallow groundwater