The project was a 13.7-mile extension of the Gold Line beginning at Union Station in Los Angeles and ending in Pasadena. This light rail transit consists of a double tracked system using electric current overhead wire and included 13 stations and a new pedestrian bridge structure.
Project Highlights :
- First Design-Build commuter rail line in Los Angeles County
- Two underground boxes - Colorado Box and Figueroa Box
- Underpinning of existing brick buildings in the historic section of Pasadena
- MSE, Keystone, and CIP retaining walls, soil nail walls
Construction Cost : $300 million