Fountain Park is a 700 unit apartment building consisting of 700,000 sq. ft. of Type 5 construction over 300,000 building, single subterranean level concrete parking structure. Group Delta Consultants (GDC) performed all geotechnical services for the project including a site investigation and geotechnical report
Project Highlights :
- The site has significant geotechnical issues such as soft and liquefiable soils, lateral spreading potential of the adjacent Ballona Creek Levee.
- GDC developed an indicator pile program including Pile Driving Analyzer Measurements, driving of 2102 14-in. square presstressed concrete piles, and observation and testing services during foundation construction.
- GDC performed all geotechnical inspections including those during the installation of stone columns